Skip to main content

Pilot results

VNPost Ho Chi Minh City Pilot: plan 13% shorter than driven

On 12 and 14 September 2026, Route4Green planned one shift a day on the level-2 mail routes of VNPost Ho Chi Minh City. The comparison with the kilometres actually driven is recorded in the meeting minutes both sides signed on 15 September 2026.

Scope of the Pilot

Customer
VNPost Ho Chi Minh City
Area
Ho Chi Minh City, level-2 mail routes
Operating days
12 September 2026 (midday shift), 14 September 2026 (morning shift)
Cargo
51.58 tonnes, the same on both sides
Comparison
GPS km driven against Route4Green planned km
Record
Meeting minutes of 15 September 2026, signed by both sides

Results for the same 51.58 tonnes

  • -13%

    distance for the same cargo, from 1,017 to 882.6 km

    VNPost Ho Chi Minh City, 12 and 14 September 2026: kilometres driven (GPS) against the Route4Green plan, for the same 51.58 tonnes of cargo.

  • -15%

    vehicle trips, from 33 to 28 trips

    VNPost Ho Chi Minh City, 12 and 14 September 2026: kilometres driven (GPS) against the Route4Green plan, for the same 51.58 tonnes of cargo.

  • +18%

    cargo per trip, from 1,563 to 1,842 kg per trip

    VNPost Ho Chi Minh City, 12 and 14 September 2026: kilometres driven (GPS) against the Route4Green plan, for the same 51.58 tonnes of cargo.

distance for the same cargoActual operation1,017 kmRoute4Green882.6 kmvehicle tripsActual operation33 tripsRoute4Green28 tripscargo per tripActual operation1,563 kg per tripRoute4Green1,842 kg per trip
VNPost Ho Chi Minh City, 12 and 14 September 2026: kilometres driven (GPS) against the Route4Green plan, for the same 51.58 tonnes of cargo.

Raw numbers by operating day

On 12 September, actual was 16 trips and 581 km carrying 24,335 kg; the plan had 8 trips and 391.89 km. On 14 September, actual was 17 trips and 436 km carrying 27,242 kg; the plan had 20 trips and 490.70 km. The three figures above add the two shifts together.

How to read these three figures

What these three figures say, and what they do not.

  1. The actual kilometres come from vehicle GPS. The Route4Green kilometres come from its plan and were not driven, except on two test routes.
  2. Both test drives ran longer than planned (41.66 km against 40.26 km, and 31.00 km against 25.17 km), so live operation may close part of the 13% gap.
  3. The two shifts gave very different results: the plan was shorter than actual on 12 September and longer on 14 September. Two days are not an average of normal operation.
  4. Cargo per trip represents total weight divided by the number of trips. It does not measure vehicle capacity utilisation.
  5. We omit cost, hours and emissions. In the signed minutes, cost is distance multiplied by a single fixed rate, so it would only repeat the distance change.

What this Pilot does not conclude

  1. Only two routes had test drives. Without a full shift run live, nothing is concluded about loading, site access or delivery deadlines.
  2. The plan's travel times are not reliable yet: it assumed 30 km/h on average, and the inner-city test drives ran at 15 to 20 km/h.
  3. No commitment on service levels, availability, processing speed or scale: two days of measurement are not a service promise.

Why the plan cut kilometres

Route4Green planned each shift's cargo in one run and regrouped the stops into new trips, so across both shifts the plan needs fewer trips and fewer kilometres for the same cargo.

Next: a Pilot on your own data

One data point is not enough to decide on. The standard 8 week Pilot adds a mandatory live shift on odometer readings and six acceptance criteria signed before day one, to close these gaps.

A Pilot with VNPost Ho Chi Minh City | Route4Green